  • Elephant Head Bridge Over The Santa Cruz River

    Project MapProject Cost: $2,200,000
    Pima County Transportation/Regional Transportation Authority
    Project Status: Completed
    Completion Date: Early 2016
    Engineer/Contractor: HDR/Hunter Contracting
     

    The Pima County Department of Transportation is currently in the construction stage of the Elephant Head Bridge.  The project consists of removal of the existing concrete bridge girders, barriers, pedestrian railing and asphaltic pavement on the bridge deck.  New precast concrete box beams will be installed along with a new concrete deck slab, traffic barriers and metal hand railing.  The approach roadways to the bridge will be repaved to meet the new bridge superstructure.

    The construction will require closure of the bridge but local traffic will use a detour along the south side of the bridge during the closure period. 

    Construction scheduled to start in late 2015.  A public meeting will be scheduled later this fall.
    Share this project with a friend.

    Community Relations

    Carol Brichta
    Program Coordinator
    Department of Transportation 
    (520) 724-6410
    email Carol Brichta 

    Transportation Engineering

    Dave Zaleski
    Bridge Engineer
    Department of Transportation
    (520) 724-6410
    email Dave Zaleski

    Follow UsShare this page

    Transportation

    Ana M. Olivares, P.E.
    Director

    201 N. Stone Ave., 4th Fl.
    Tucson, AZ 85701

    (520) 724-6410


    Department Home Page
    Department News
    Department Directory
    Feedback
    Boards, Commissions and Committees
    Report a problem
    Permitting
    Maps
    Volunteer