    Partial Elevation View

    Project Cost: $5,010,000
    Project Status: Complete
    Completion Date: Spring 2014
    Engineer/Contractor: Southern Arizona Paving

    This project proposes to improve Orange Grove Road from east of Camino De La Tierra to west of La Cholla Boulevard. Improvements will reduce congestion and enhance safety and operations.

    Proposed Improvements consist of the following:
    • Widening the 3-lane section to a 5-lane section on Orange Grove from Camino de la Tierra to La Cholla Boulevard. The improvements will provide the following roadway features:
      • Two Eastbound travel lanes
      • Two Wesbound travel lanes
      • Center turn-lane
      • Paved shoulders on each side (bicycle use)
    • The project will include the design of the following features that will be constructed when funding is available:
      • Pedestrian path (one side of the road)
      • Landscaping

    Construction Alert - November 27, 2013 - Traffic Control Change

    Community Relations

    Annabelle Valenzuela
    Program Manager
    Department of Transportation
    (520) 724-6410
    email Annabelle Valenzuela

    Carol Brichta
    Program Coordinator
    Department of Transportation
    (520) 724-6410
    email Carol Brichta

    Transportation Engineering

    (520) 724-6410 

    Meeting Announcements and Minutes

    Project Documents

    Follow UsShare this page

    Transportation

    Ana M. Olivares, P.E.
    Director

    201 N. Stone Ave., 4th Fl.
    Tucson, AZ 85701

    (520) 724-6410


    Department Home Page
    Department News
    Department Directory
    Feedback
    Boards, Commissions and Committees
    Report a problem
    Permitting
    Maps
    Volunteer