Pima County Logo
  • Sewerage Capacity Allocation

    Sewerage Capacity Allocation Letter is required prior to a new connection to the sewerage system or change in dischargeable flows made by an existing connection.

    The process leading up to a capacity allocation (Type III) is a progressive review of the sewer system’s availability to manage the new flow being added by a specific development.

    • The Type I (Investigation) request should be submitted in the early stages of development so both the owner and department are aware of the impacts the development may have on the sewer system.
    • The Type II (Availability) request should be submitted prior to the conceptual design phase to verify the status of capacity in the sewer system for the development.
    • The Type III (Allocation) request should be made prior to submitting public sewer improvement plans, or if no public sewer is part of the project, prior to applying for a site/building permit.
    The capacity allocated in a Type III (3) letter only becomes final when the connection conditions are met.

    The request forms below are fillable PDF format, and must be sent via email to: RWRDCapacityResponse@pima.gov
    This email address may also be used for questions about the capacity process.

    Sewer Capacity Allocation:
    Kurt Stemm
    (520) 724-6607
    Escalation & Problem Resolution:
    Lorenzo Hernandez
    (520) 724-6645

    Type I - Investigation Request

    An initial investigation to see if conveyance and treatment capacity are feasible and is required for a zoning or site analysis. Investigation Request instructions.

    Type II - Availability Request

    A request for sewer availability pertaining to Development Plans, Tentative Plat and Site Plans. Availability Request instructions.

    Type III - Allocation Request

    A request for capacity allocation. Allocation Request instructions.

    Table 1. Unit Design Flows

    Table used for determining design flow for sewers

    Application Process Notice, see Regulatory Bill of Rights

    Follow UsShare this page

    Wastewater Reclamation

    Planning & Engineering
    201 N. Stone Ave., 3rd Fl.
    Tucson, AZ 85701

    (520) 724-6500


    Development Liaison
    201 N. Stone Ave., 1st Fl.
    Tucson, AZ 85701

    (520) 724-6602


    Field Engineering
    1313 Mission Rd.
    Tucson, AZ 85713

    (520) 740-2651


    Department Home Page
    Department News
    Department Directory