  • FC5.02 Green Valley - Abrego Drive Culvert

    Total Actual Cost: $286,204
    Project Number: CFC5GVABC
    Funding Sources: 2004 General Obligation Bonds
    Date: May 2005
    Managing Dept.: Transportation
    Map: GIS Map

    This program was coordinated between RFCD and Transportaion; using 2004 General Obligation Funds to complete the concrete box culvert inconjunction with transportaion improvments on Abrego Drive. Improvements focused on protecting residential and commercial developments adjacent to river courses to alleviate flooding, and safeguard flood protection benefits provided by existing flood control facilities.

    Flood control improvements along major watercourses has removed the threat of flooding from the major rivers; however, residences and businesses remained subject to flood damage and are within federal floodplain hazard zones from tributary washes. This program addressed flood hazards from these tributary washes.
    Follow UsShare or bookmark this page

    Pima County Bonds

    (520) 724-8149


    Department Home
    Bond News
    Department Directory
    Feedback
    Boards, Commissions and Committees