Project Cost: 19,527,000
Project Status: Under Construction
Completion Date: Construction fall 2020 - spring 2022
Engineer/Contractor: PSOMAS / KE&G Construction
The Pima County Department of Transportation is widening approximately 1.9 miles of Kolb Road from a 2-lane roadway to a 3-lane roadway with multi-use paved shoulders suitable for bicycle use, sidewalk, drainage and landscaping. The median treatment will be a two-way left turn lane. A roundabout will be installed at the Territory and Kolb intersection. Construction beginning in the fall of 2020 on the western half of the roadway at Sabino Canyon and work north to Sunrise Drive, then shift to the eastern portion of the roadway at Sunrise Drive and continue south to Sabino Canyon. Project construction is anticipated to be completed by spring 2022.
This project is part of the 1997 HURF Bond Program, DOT32.