DOT-47 Sunrise Drive: Craycroft Road to Kolb Road
Total Actual Cost: $ 12,239,764
Project Number: CTR4SRCRA
Funding Sources: 1997 HURF Bonds
Completion Date: February 2011
Managing Dept.: Transportation
Project Map: GIS Map
The project included reconstruction of 1.9 miles of the existing two-lane Sunrise Drive to provide improved sight distance, channelized intersections, exclusive turn lanes, slope stabilization, cross drainage facilities, storm drain, irrigated landscaping, traffic signal upgrade, intersection lighting, striping and signing, a raised median, sidewalk, and public art. The signalized intersection at Kolb Road was reconstructed.
The improvements will reduce congestion and enhance safety along Sunrise Drive. The estimated economic value of the improvements to traffic flow and reductions in accidents are $41.84 million. The benefit/cost ratio is 2.2:1.