  • South Houghton Road Widening Project

    South Houghton
    Project Cost:
    $30,000,000
    Project Status: In Design
    Completion Date: December 2022 
    Engineer/Contractor: Psomas/TBD

    The Pima County Department of Transportation is currently in the design stage of the re-construction and widening of approximately 3 miles of Houghton Road, from the I-10 Interchange south to Andrada Polytechnic and Pantano High Schools.

    The project will reconstruct the current 2-lane roadway to a divided 4-lane section with two travel lanes in each directions, a separated multi-use path that will connect to the Loop, and drainage improvements.

    Construction is planned 
    to begin in the second half of 2021. The project is being funded through regional development impact fees.

    Contact Information

    Community Relations

    Carol Brichta
    Program Manager
    Department of Transportation
    (520) 724-6442
    email: Carol Brichta 

    Transportation Engineering

    Mandley Rust
    Project Manager
    Department of Transportation
    (520) 724-6410
    email: Mandley Rust

    Follow UsShare this page

    Transportation

    Ana M. Olivares, P.E.
    Director

    201 N. Stone Ave., 4th Fl.
    Tucson, AZ 85701

    (520) 724-6410


    Department Home Page
    Department News
    Department Directory
    Feedback
    Boards, Commissions and Committees
    Report a problem
    Permitting
    Maps
    Volunteer with Pima County
    Volunteer