  • El Paso Natural Gas Company

    El Paso Natural Gas Company, L.L.C. (EPNG), a Kinder Morgan Company, provides natural gas transportation services for natural gas suppliers and end users throughout the southwestern United States and owns and operates a large pipeline network.  The Vail compressor Station  is one of such stations that provides natural gas compression to the pipeline network.  Natural gas compression is needed to maintain enough pressure in the pipeline to keep the natural gas flowing, and it is accomplished with three natural gas fired turbines that drive the compressor units.  The facility is permitted to operate 24 hrs a day and 365 days a year.



    The proposed project expects to trigger a major modification for NOx and CO subject to the Prevention of Significant Deterioration (PSD) permitting. As such, air quality dispersion modeling analysis is required to demonstrate that new emissions from the major modification, will not cause or contribute to a violation of any National Ambient Air Quality Standards (NAAQS).

    WEBPAGE UPDATED ON A REGULAR BASIS

    AS DOCUMENTS BECOME AVAILABLE

    The information below provides a chronological list of the documentation related to this complex process from the projects inception to its conclusion. PDEQ is utilizing this repository webpage to provide easy access to the documents for the public comment period and to facilitate an open dialogue and the sharing of information with all interested parties.

    Permit Application Documentation

    Date Received

    Document Title

    06-24-2020

    06-22-2020          

    06-22-2020

    05-22-2020

    03-09-2020

    02-10-2020

    02-10-2020

    Air Dispersion Modelling Analysis

    Biological Evaluation Report

    Cultural Resource Survey

    Section 7 Analysis and Section 106 Consultation Request

    Modeling Protocol v2.0

    Administrative Completeness Determination

    Permit Modification Application

    Permit Compliance & Testing Documentation

    Date Received

    Document Title

    02-25-2011

    12-08-2007

    05-01-2003

    2011 Performance Test Report

    2007 Performance Test Report

    2003 Performance Test Report

    Existing Permit Documentation

    Date Issued

    Document Title

    07-08-2015 Permit

    Technical Support Documentation

    Potential To Emit



    Follow UsShare this page

    Department of Environmental Quality

    33 N. Stone Ave., Suite 700
    Tucson, AZ 85701

    Phone: (520) 724-7400
    Fax: (520) 838-7432


    Department Home Page
    Department News
    Department Hours
    Department Directory
    Department Feedback Form
    Report a problem
    Department Calendar
    Boards, Commissions and Committees
    Rules and Regulations
    Reports and Publications
    Department Forms
    Permitting
    Fees