Health Alert:   COVID-19 Transmission Level:   MODERATE   More information
Wear a mask; stay home.
Pima County Government Logo
  • Increase font size
  • Decrease font size
  • Print
  • RSS
  • Kolb Road: Sabino Canyon To Sunrise Drive Construction Project

    Oct 21, 2020 | Read More News
    Share this page

    Road RepairThe Pima County Department of Transportation, along with its contractor, KE&G Construction, will begin the roadway improvement construction project on Kolb Road from Sabino Canyon to Sunrise Drive.

    Project Activity: Starting Monday, October 26 from 6 a.m. and 3 p.m., Monday through Friday, the contractor will begin clearing and grubbing vegetation, potholing, placing caution fencing and mobilizing equipment.

    Project Scope: Project improvements include widening Kolb Road from a 2-lane roadway to a 3-lane roadway with multi-use paved shoulders suitable for bicycle use, sidewalks and/or pathways, drainage and landscaping. The median treatment will be a two-way left turn lane and a roundabout will be installed at the Territory Drive and Kolb Road intersection. This project is part of the 1997 HURF Bond Program, specifically project DOT 32. Expected completion is spring of 2022.

    Please approach the area with caution and obey all traffic control devices. Speed limit will be reduced to 25 MPH through the construction zone.