Health Alert:   COVID-19 Transmission Level:   MODERATE   More information
Wear a mask; stay home.
Pima County Government Logo
  • Increase font size
  • Decrease font size
  • Print
  • RSS
  • Speedway Boulevard – Painted Hills Road To Camino De Oeste

    Apr 02, 2021 | Read More News
    Share this page

    Pavement Preservation The Pima County Department of Transportation, along with its contractor, Southern Arizona Paving, will begin paving operations Monday, April 5 through Friday, April 9 between 6 a.m. and 6 p.m.

    The work will consist of paving Speedway Boulevard, side streets and driveways.

    Due to the conditions of the work zone travelers should anticipate lengthy delays with flaggers and alternating one-way traffic being led by a pilot vehicle through the entire 1.6-mile project limits. Alternate routes are recommended to avoid the area during this work.

    Those traveling through the work zone are being asked to please slow down and approach the area with caution and obey all traffic control devices. Watch for heavy equipment and construction personnel working throughout the length of the project.

    In the event of mechanical failure or inclement weather, the construction schedule is subject to change.