  • South Houghton Road Widening Project Update Sept 23, 2021

    Sep 24, 2021 | Read More News
    Share this page

    Pavement Preservation
    Starting Sunday night, September 26 through Monday morning, September 27, between the nighttime hours of 7 p.m. and 7 a.m., the Pima County Department of Transportation, along with its contractor, Borderland Construction and Tucson Electric Power (TEP), will be installing a new conduit electric line near the Pima County Fairgrounds. This work is a continuation of installations for the roadway improvement construction project on South Houghton Road from I-10 interchange to Andrada Polytechnic High School. 

     Project Activity

    The contractor along with TEP will be installing a new conduit electric line. This work will require a nighttime closure on Houghton Road between Brekke Road and Dawn Road. In order to maintain traffic along Houghton Road, a detour will be implemented around the fairgrounds by using Brekke Road or Dawn Road.

     Project Scope

    Improvements will include widening of South Houghton Road from a 2-lane roadway to a divided 4-lane roadway, a separated multi-use path that will connect to The Loop, and drainage and intersection improvements.  The project is expected to be completed late winter of 2022/2023.

    For more information on the project, please visit www.Roadprojects.pima.gov.

    Please approach the area with caution and obey all traffic control devices. Traffic control changes and speed reductions will occur as work progresses.