• Increase font size
  • Decrease font size
  • Print
  • RSS
  • PR4.20 Thomas Jay Senior Field Lighting

    Total Actual Cost: $288,145
    Project Number: CPRPLITTJ
    Funding Sources: 2004 General Obligation Bonds
    Completion Date: November 2014
    Managing Dept.: Natural Resources Parks and Recreation
    Project Map: GIS Map

    New sports lighting was installed at the existing senior field north of the Julian Wash at Thomas Jay Park. A new Musco control system was installed to control existing lights on two other fields at the park.
    This improved lighting extends the times the fields can be used. The new field lighting system also allows for online tracking and control of the lighting system.  This improves the management, scheduling and maintenance of the sports fields. This installation brings the equipment into compliance with the current standards set by  Pima County Natural Resources Parks and Recreation.
    The project design included a creative response to the existing electrical service size. When originally installed, the electrical service was at a lower voltage than similar parks, as this was just the first of several fields at this location. To accommodate a future upgrade in voltage service, the design used a 480 volt design, and used a step up transformer in order to do so. This will result in properly sized wiring and fixtures when the electrical service is upgraded.

    Thomas Jay Field 1of2Thomas Jay 2 of 2

    Follow UsShare or bookmark this page

    Pima County Bonds

    (520) 724-8149


    Department Home
    Bond News
    Department Directory
    Feedback
    Boards, Commissions and Committees