• Increase font size
  • Decrease font size
  • Print
  • RSS
  • FC5.05 Pascua Yaqui Tribe Black Wash Urban Drainage Improvements

    Total Actual Cost: $973,064
    Project Number: CFC5UDPYT
    Funding Sources: 2004 General Obligation Bonds & Other Funding
    Completion Date: September, 2014
    Managing Dept.: Regional Flood Control District
    Project Map: GIS Map

    Improvements included construction of north-south drainage channel and cross-drainage structures at roadway crossings within Tribal boundaries. Primary focus was the Black Wash dip section along Ignacio Baumea Boulevard and erosion control including rip-rap installation, utility relocation, design and construction. This project included solutions to local drainage problems which limited accessibility to tribal and county areas and facilities south of Valencia between Camino de Oeste and Ignacio Baumea Boulvard.
    Pasqua Yaqui 1of3Pasqua Yaqui 2of2Pasqua Yaqui 3of3
    Follow UsShare or bookmark this page

    Pima County Bonds

    (520) 724-8149


    Department Home
    Bond News
    Department Directory
    Feedback
    Boards, Commissions and Committees