FC5.02 Green Valley Erosion Control
Total Actual Cost: $1,438,094
Project Number: CFC5GVERC
Funding Sources: 2004 General Obligation Bonds & Other Funding
Completion Date: January, 2011
Managing Dept.: Regional Flood Control District
Project Map: GIS Map
The project provided drainage improvements to control flooding and erosion in drainage ways located in Green Valley, Arizona. Drainage improvements were preformed in drainage ways 1, 3, 6, 7, 9, 13, 17, 24, and 25. The improvements ranged from filling scour holes with rip-rap and repairing existing structures to the construction of new bank protection and grade control structures.
In addition to the improvements, the District also conducted the Green Valley 2010 Drainage Way Evaluations to reassess the original RS Engineering May 2004 report and to update the maintenance and engineering improvements needed for Green Valley.