  • DOT-59 Pavement Repair and Rehabilitation, FY19

    Total Actual Cost: $8,861,823
    Project Number:  CTR.4PPP19
    Funding Sources: 1997 HURF Bonds
    Completion Date: July 2019 
    Managing Dept.: Transportation
    Project Map:  County-wide

    Due to the amount of pavement preservation needed countywide, work was prioritized for this project and a plan implemented to complete other work in future years. Mill and fill was used as the preservation method on 33 miles of road.

    Pima County operates and maintains over 1,700 miles of paved roads. They vary in width from simple 2-lane rural roads to 6-lane divided urban thoroughfares. A roadway system of this magnitude is in continual need of maintenance and utilizing various pavement preservation and repair measures helps to mitigate deterioration and extend the roadway life.

    Sweetwater Dr-Blue Bonnet to Six Bar SpurSweetwater Dr-Six Bar Spur to Camino de Oeste