• Increase font size
  • Decrease font size
  • Print
  • RSS
  • PR4.36 Atturbury Wash Sanctuary - COT

    Total Project Cost: $1,165,382
    Project Number: CPR.PATTUR
    Funding Sources: 2004 General Obligation Bonds
    Completion Date: March 2013
    Managing Dept.: Natural Resources Parks and Recreation, CIty of Tucson
    Project Map: GIS Map

     A three-quarter-mile path was constructed to run through Lincoln Park, linking the Fred Enke Golf Course, Pima College East Campus, Clements Center, the Children’s Outdoor Performance Area, the Lincoln Park softball complex, Lower Lincoln Park, and the Michael Lyman Wash Animal and Bird Sanctuary. The central plaza and the Children’s Outdoor Performance Area were built along the path near the softball complex.
    Three shade ramadas with picnic tables were built within the central plaza.  Two entry plazas and monuments were built at each end of the greenway. The greenway’s benches and picnic tables were designed and built to complement six public art installations.
    Atturbury Wash Sanctuary - COTAtturbury Wash Sanctuary - COT
    Follow UsShare or bookmark this page

    Pima County Bonds

    (520) 724-8149


    Department Home
    Bond News
    Department Directory
    Feedback
    Boards, Commissions and Committees