  • PR4.33 Harrison Greenway Phase I at Rita Road

    Total Project Cost: $630,154
    Project Number: CPR.PHA1RR
    Funding Sources: 2004 General Obligation Bonds
    Completion Date: July 2013
    Managing Dept.: Project Management Office
    Project Map: GIS Map

    The Harrison Greenway connects the Julian Wash Greenway and the Pantano Wash River park. This project is the northern third of the greenway, connecting from Irvington Road (where Fantasy Island bike facility is located) to the existing Pantano Riverpark connection on Sellarole Road. It is a critical connector project for the Loop.
    Harrison Greenway Phase 1RR2
    The first section installed was at Mesquite Elementary and includes both asphalt and soft path, landscaping, and adjustments to the elementary parking lot in exchange for the land. This will connect to pending state land to the north. The second section travels along the south face of Mesquite and along the drainage channel to connect with Nexus and Rita Roads and the existing bike lanes. This included coordination with the school bus connections.
    Harrison Greenway Phase 1RR
    The final section continues bike lanes south of Old Vail Road on Rita, to connect with a COT project at the Railroad/Julian Wash Greenway. This critical connection provides bike and sidewalk connections on Rita past a drainage pinch point to ensure continuation of bike lanes throughout all of Rita Road, not previously in the City’s project plan.